Reduction of
occupied area
more than in 50 times

Stepkin Technology
automated treatment complexes

 

The Automated Treatment Complex, Developed in 2003-2004
UGO - Gas-condensate Waste Utilization
The Complex is designed for local treatment of chemically contaminant, oily, domestic and industrial effluents of gas-condensate plants; with further waste treatment to obtain harmless or marketable products.

Productive capacity: 8500 m3/24 hours
Electric power consumed on water treatment: 0,7 kilowatt-hour per 1 m3 of waste water
Equipment: Hydrocyclones, separators, floaters, bioreactors, sedimentators, post-treatment module, disinfection plant, enzyme cavitational reactors, pumping equipment, handling machinery, demineralizing (distillation) plant, salt separation plant.
Complex assembly and installation period: 90 days or by an agreement with a customer
Period of putting the Complex into operation: attaining the planned capacity or planned operating duty (including balancing and commissioning): 90 days
Dimensions: floor space - 42 x 36 m, height - 15 m, Complex equipment weight: 1425 tons
Transportation:
- by trucks (trailers);
- by river transports ("river-sea" class dry cargo ship);
- by railroad transport.
Support personnel - 5 persons 1 person - Complex supervisor (with duties to sampling for laboratory analysis; responsible for compliance with Complex technological and service regulations); 4 persons - supporting shift personnel
Production capabilities
- effluents cleansing from oil products on 99,9, full oxidation of specific organic pollutants on 99,9 %
- collection and dehydration of collected oil products (up to 3-5%, depending on effluent chemical composition) for further using as fuel
- generation of high-quality distillate for possible use in production processes;
- obtaining of marketable salt product.

UGO specifications, variant no.1
Name Measure unit Contaminant concentration Treated water
Industrial, domestic and storm effluents Chemically contaminant effluents
Suspended solids mg/l up to 200 up to 500 1,0
Substance activity pH 6,0-8,5 7,5-10 6,5-7,0
Dry residue mg/l up to 1200 up to 1200 1,0
COD MgÎ2/l 800 18000 0,8
BOD20 mgÎ2/l 300 4300 0,3
Ammonia nitrogen (NH4) mg/l up to 5,0 up to 90 0,03
Phosphates (PO4) mg/l up to 1,0 up to 86 0,01
Chlorides mg/l up to 170 up to 180 0,01
Sulphates mg/l up to 350 up to 350 0,03
Diethanolamine mg/l up to 10 up to 7000 0,01
Monoethylenglycol mg/l up to 5 up to 10000 0,02
Fe mg/l 0,3 0,3 0,01
Oil products mg/l up to 200 up to 1000 0,05
Hydrogen sulphide mg/l up to 8,5 up to 19 0,03
Temperature Degree 10-20 10-30 20

UGO specifications, variant no.2
Name Measure unit Before treatment After treatment
Oil products mg/l up to 500 up to 1,0
Total hardness meq/l up to 15 up to 1,0
Suspended solids mg/l up to 280 up to 1,0
Total salt content mg/l up to 2800 up to 1,0
Chlorides mg/l up to 500 up to 0,1
Sulphates mg/l up to 900 up to 0,03
Fe mg/l up to 8 up to 0,01
COD mg/l 600 up to 1,0
pH 8-9,2 up to 6,5

 


The Automated Treatment Complex
Concentrated Industrial Products
The Complex is designed for local treatment of highly polluted chemical, oily and mixed domestic and industrial effluents of petrochemical plants.

Productive capacity: 2000 m3/24 hours
Electric power consumed: 87-90 kilowatt-hour
Equipment: Hydrocyclones, separators, floaters, bioreactors, sedimentators, post-treatment module, disinfection plant, enzyme cavitational reactors, pumping equipment, handling machinery.
Complex assembly and installation period:90 days or by an agreement with a customer
Period of putting the Complex into operation: attaining the planned capacity or planned operating duty (including balancing and commissioning): 120 days
Dimensions: floor space - 10 m x 20 m, height - 13,5 m, no sanitary zone required, Complex equipment weight: 300 tons
Transportation: by trucks (30 trailers); by river transports ("river-sea" class dry cargo ship)
Support personnel - 5 persons, 1 person - Complex supervisor (with duties to sampling for laboratory analysis; responsible for compliance with Complex technological and service regulations); 4 persons - supporting shift personnel
Production capabilities
- treatment of highly polluted industrial effluents;
- transformation of petrochemical waste into marketable and processable product;
- treated technical water multiple recycle for enterprise cycles of water circulation

 

The Automated Treatment Complex, variant 1
OASIS-4
The Complex is designed for treatment of mixed industrial and domestic effluents of the city with population of 20000; on the following basis of effluents calculation: 100 liters per person and 2000 m3 of industrial effluents per 24 hours

Productive capacity: 4000 m3/24 hours
Electric power consumed: 60 kilowatt-hour
Equipment: Maceration grates, hydrocyclones, separators, floaters, bioreactors, sedimentators, post-treatment module (existing secondary sedimentation reservoirs reequipment), disinfection plant, enzyme cavitational reactors, pumping equipment, handling machinery, underfloat outlet of treated water.
Complex assembly and installation period: 120-130 days or by an agreement with a customer
Period of putting the Complex into operation: attaining the planned capacity or planned operating duty (including balancing and commissioning): 130 days
Dimensions: floor space - 10 m x 10 m, height - 15 m, no sanitary zone required, Complex equipment weight: 400 tons
Transportation: by trucks (40 trailers); by river transports ("river-sea" class dry cargo ship)
Support personnel - 5 persons, 1 person - Complex supervisor (with duties to sampling for laboratory analysis; responsible for compliance with Complex technological and service regulations); 4 persons - supporting shift person
Production capabilities
- industrial and domestic waste waters treatment to comply the requirements for dumping into fishery water basins (clear technical water), with further ability of using the water for enterprise and municipal operating needs);
- sewage sludge stabilization, disinfection and transformation into organic-mineral product; suitable for agricultural and municipal needs.

 

The Automated Treatment Complex, variant 2
OASIS-4
The Complex is designed for treatment of industrial and domestic effluents of the city with population of 20000; on the following basis of effluents calculation: 100 liters per person

Productive capacity: 2000 m3/24 hours
Electric power consumed: 30 kilowatt-hour
Equipment: Maceration grates, hydrocyclones, bioreactors, sedimentators, post-treatment module, disinfection plant, enzyme cavitational reactors, pumping equipment, handling machinery.
Complex assembly and installation period: 120-130 days or by an agreement with a customer
Period of putting the Complex into operation: attaining the planned capacity or planned operating duty (including balancing and commissioning): 130 days
Dimensions: floor space - 10 m x 10 m, height - 15 m, Can be installed in the residential area no sanitary zone required, Complex equipment weight: 200 tons
Transportation: by trucks (20 trailers); by river transports ("river-sea" class dry cargo ship)
Support personnel - 5 persons, 1 person - Complex supervisor (with duties to sampling for laboratory analysis; responsible for compliance with Complex technological and service regulations); 4 persons - supporting shift personnel
Production capabilities
- industrial and domestic waste waters treatment to comply the requirements for dumping into fishery water basins (clear technical water), with further ability of using the water for enterprise and municipal operating needs);
- sewage sludge stabilization, disinfection and transformation into organic-mineral product, suitable for agricultural and municipal needs.

 

The Automated Treatment Complex, developed in 2004, variant 3
OASIS-4
The Complex is designed for biological treatment of domestic waste water of 500 rooms hotel complex

Productive capacity: 100 m3/24 hours
Electric power consumed: 1,5 kilowatt-hour
Equipment: Maceration grates, hydrocyclones, , bioreactors, sedimentators, post-treatment module, disinfection plant, enzyme cavitational reactors, pumping equipment, handling machinery.
Complex assembly and installation period: 20-30 days or by an agreement with a customer
Period of putting the Complex into operation: attaining the planned capacity or planned operating duty (including balancing and commissioning): 25-30 days
Dimensions of the Complex: floor space - 3 m x 3 m, height - 10-12 m, Can be installed in the residential area no sanitary zone required, Complex equipment weight: 45 tons
Transportation: by trucks (4 trailers);
Support personnel appointed from the functioning maintenance staff of the enterprise by the persons, responsible for compliance with the Complex technological regulations
Production capabilities
- biological treatment of input industrial and domestic effluents to the state of clear technical water;
-treatment of appearing sewage sludge and its transformation into pathogen-free, non-hazardous product, suitable for agricultural and municipal application

 

Automated mobile complex "Anti-Toxicant Technologies"
ATT
The Complex is designed for supertoxicant removal (waste transformer oils, toxic chemical and pharmaceutical waste, pesticides)

Productive capacity: 1 ton/hour
Consumed energy resources: kerosene- 0,125 ton/hour, oxygene - 1,2 ton/hour
Equipment (modules): core process execution module, liquid supertoxicant receiving module, fuel receiving module, chemically treated and technical water receiving module, solution and neutralizer preparation module, mobile diesel-powered power plant module, control module, mobile oxygen gasification plant module, utility module.
Complex assembly and installation period: 30 days or by an agreement with a customer
Period of putting the Complex into operation: attaining the planned capacity or planned operating duty (including balancing and commissioning): 30 days
Dimensions the complex: total site area - 60 m õ 60 m, dimensions -12,2 m õ 44 m õ 2,6 m, Weight (with the container): 10 ton
Transportation: by all transport means
Support personnel: 1 person. The process is fully automated and the support consists of monitoring the values.
Production capabilities - toxic agents degeneration effectiveness 99,999 %

 

The Automated Treatment Complex, developed in 2004 "The Recultivator Ground"
OASIS-TGR
The local automated complex is designed for sewage sludge treatment, performed without use of any chemical agents. Can be installed on treatment plants without suspension of technological process.

Productive capacity: 100 - 25 000 m3 of sewage sludge/24 hours
Electric power consumed on water treatment: 0,6 kilowatt-hour per 1 m3 of sewage sludge
Equipment: Enzyme cavitational reactors, sedimentators, pumping equipment, handling machinery.
The complex assembly and installation period: 30 days or by an agreement with a customer
Period of putting the Module into operation: attaining the planned capacity or planned operating duty (including balancing and commissioning): 30 days
Can be installed in the residential area no sanitary zone required
Transportation: by trucks (trailers)
Support personnel: support personnel - 5 persons, 1 person - Complex supervisor (with duties to sampling for laboratory analysis; responsible for compliance with Complex technological and service regulations); 4 persons - supporting shift personnel
Production capabilities - treatment and disinfection of sewage sludge, new as well as accumulated on sludge maps; its transformation into marketable certified product suitable for agricultural and municipal application.

 

The Integral Biological Treatment Module, variant 1
OASIS-3
The Module is designed for treatment of mixed (heavy) industrial and domestic effluents of meat-processing plant.

Productive capacity: 20 m3/24 hours (up to 250 m3/24 hours)
Consumed electric power: 3 kilowatt-hour
Equipment: Maceration grates, hydrocyclones, bioreactors, sedimentators, post-treatment module, disinfection plant, enzyme cavitational reactors, pumping equipment, handling machinery.
Module assembly and installation period: 20-30 days or by an agreement with a customer
Period of putting the Module into operation: attaining the planned capacity or planned operating duty (including balancing and commissioning): 30-40 days
Dimensions: floor space- 3 m x 3 m, height - 10-12 m, Can be installed in the residential area no sanitary zone required, Module equipment weight: 30 tons
Transportation: by trucks (3 trailers);
Support personnel. appointed from the functioning maintenance staff of the enterprise by the persons, responsible for compliance with the Module technological regulations
Production capabilities:
-
biological treatment of input industrial and domestic effluent to the state of clear technical water;
- treatment of appearing sewage sludge

 

The Integral Biological Treatment Module, variant 2
OASIS-3
The Module is designed for treatment of mixed (heavy) industrial and domestic effluents of olive-processing plant.

Productive capacity: 100 m3/24 hours (up to 250 m3/24 hours)
Consumed electric power: 2 kilowatt-hour
Equipment: Maceration grates, hydrocyclones, fat collectors, bioreactors, sedimentators, post-treatment module, disinfection plant, enzyme cavitational reactors, pumping equipment, handling machinery
Module assembly and installation period: 20-30 days or by an agreement with a customer
Dimensions: floor space- 3 m x 3 m, height - 10-12 m, Can be installed in the residential area no sanitary zone required, Module equipment weight: 45 tons
Transportation: by trucks (4 trailers) àâòîòðàíñïîðòîì (òðåéëåðû) 4 ìàøèíû
Support personnel. appointed from the functioning maintenance staff of the enterprise by the persons, responsible for compliance with the Module technological regulations
Production capabilities
- biological treatment of input industrial and domestic effluent to the state of clear technical water;
- treatment of appearing sewage sludge

 

The Automated Treatment Complex
FILTRATE
The local automated complex is designed for landfill filtrate treatment.

Productive capacity: 300 m3/24 hours
Electric power consumed on water treatment: 7,5-8 kilowatt-hour
Equipment: Maceration grates, hydrocyclones, separators, floaters, bioreactors, post-treatment module, disinfection plant, enzyme cavitational reactors, pumping equipment, handling machinery, heavy metal sedimentation plant.
Complex assembly and installation period: 21-30 days or by an agreement with a customer
Period of putting the Module into operation: attaining the planned capacity or planned operating duty (including balancing and commissioning): 130 days
Dimensions of the complex: floor space - 10 m x 20 m, height - 12 m, Complex equipment weight: 130 tonn
Transportation: by trucks (13 trailers)
Support personnel - 5 persons, 1 person - Complex supervisor (with duties to sampling for laboratory analysis; responsible for compliance with Complex technological and service regulations); 4 persons - supporting shift personnel
Production capabilities - filtrate effluent treatment and neutralization to the state harmless for health